Installation and Assembly:

Projector Enclosure

Models: PE 1120, PE 1120-W

3215 W. North Ave. ??? Melrose Park, IL 60160 ??? (800) 729-0307 or (708) 865-8870 ??? Fax: (708) 865-2941 ??? www.peerlessmounts.com

ISSUED: 07-11-06 SHEET #: 055-9462-1

Note: Read entire instruction sheet before you start installation and assembly.

WARNING

???Do not begin to install your Peerless product until you have read and understood the instructions and warnings contained in this Installation Sheet. If you have any questions regarding any of the instructions or warnings, please call Peerless customer care at 1-800-729-0307.

???This product should only be installed by a qualified professional.

???Make sure that the supporting surface will safely support the combined load of the equipment and all attached hard- ware and components.

???Always use an assistant or mechanical lifting equipment to safely lift and position equipment.

???Tighten screws firmly, but do not overtighten. Overtightening can damage the items, greatly reducing their holding power.

IMPORTANT! Turn to the appropriate page for your ceiling installation.

Tools Needed for Assembly

???open-end 8 mm wrench

???open-end 1/2" wrench

For customer care call (800) 729-0307 or (708) 865-8870.

B

A

E F

CD G H

Suspended Ceiling Application

WARNING

???Make sure that the supporting surface will safely support the combined load of the equipment and all attached hard- ware and components.

Note: If flush mount tube has been installed in suspended ceiling mount, remove it before proceeding with this step.

shown in detail 1.

continue to extension column application on page 5 for attachment of projector enclosure...

CEILINGMOUNT

M5 X 10 MM

DETAIL1 SCREW

FLUSH MOUNT TUBE

Extension Column Application

WARNING

???Make sure that the supporting surface will safely support the combined load of the equipment and all attached hard- ware and components.

Note: Refer to projector mount instruction sheet for attachment of projector mount to extension column.

tighten all nylock nuts on pole clamp (C).

Note: Pole clamp (C) will work with 1" to 1-1/2" NPT pipe.

1-1 Slide top plates (B) together over pole clamp (C). Slide M5 screws into keyhole slots and tighten as shown in detail 1.

Note: If M5 screws are inaccessible from the top, remove them from top plates and insert from the bottom using bottom holes and keyhole slots.

G

M5 SCREW

KEYHOLE SLOT

BOTTOM HOLE

BOTTOM

KEYHOLE SLOT

1-2

1-3

DETAIL 1

Align slots in top plates (B) with holes in pole clamp (C) and insert three M5 x 10 mm hex screws (H). Tighten screws using open-end 8 mm wrench (not provided).

Rotate top plates (B) and pole clamp (C) until top plates are parallel with projector. Then, tighten nylock nuts on pole clamp using an open-end 1/2" wrench (not provided).

continue to step 2 on page 7...

H

B

C

Flush Mount Application

WARNING

???Make sure that the supporting surface will safely support the combined load of the equipment and all attached hard- ware and components.

Note: It is the responsibility of the installer to provide fasteners appropriate for the mounting surface.

M5 PENTAPIN

SCREW

B B

CEILING

fig 1.1

Note: Refer to projector mount instruction sheet for attachment of projector mount to ceiling.

CEILING

B

PROJECTOR

MOUNT

fig 1.2

Slide rods (D) into holes of projector cage (A). Use 2 as many rods as necessary to prevent projector

from being removed from projector cage.

Note: Position rods where projector lens will not be obstructed.

D

A

cage into slots of other top plate and slide over until all pegs are resting on middle notches of slots.

E

B

A B

Note: Padlock may be used for added security.

PEG

A

SLOT

?? 2006 Peerless Industries, Inc. All rights reserved. Peerless is a registered trademark of Peerless Industries, Inc.

All other brand and product names are trademarks or registered trademarks of their respective owners.