Note
Before using this information and the product it supports, be sure to read the information in ???Appendix D. Notices??? on page 45.
Sixth Edition (May 2001)
This edition replaces
?? Copyright International Business Machines Corporation 1997, 2001. All rights reserved.
US Government Users Restricted Rights ??? Use, duplication or disclosure restricted by GSA ADP Schedule Contract with IBM Corp.
Contents
iSeries 940x
Chapter 3. Procedure for an Upgrade
Preparing the Current System . . . . . . . . 18 Preparing for System Assurance prior to
hardware upgrade . . . . . . . . . . . 20 System Assurance Checkpoint . . . . . . . 23
Installing the Hardware for the
Chapter 4. Procedure for a Data
Migration
Prerequisites for data migration (RISC to RISC) . . 31 Preparing the source system for the migration . . . 31 Data migration
Appendix A. AS/400 Global Services . . 35
Appendix B. Considerations and Solutions. . . . . . . . . . . . . . 39
How to Move Freed Database Files without New Members . . . . . . . . . . . . . . 41
Information . . . . . . . . . . . . . 43
Appendix D. Notices . . . . . . . . . 45
iv iSeries 940x
iSeries 940x
Use this book as a guide for planning and conducting an upgrade or data migration, from one iSeries 400 or AS/400 reduced instruction set computer (RISC), to another RISC model.
For information on supported releases, see
http://as400service.ibm.com/supporthome.nsf/document/17623433
See ???Prerequisite and related information??? on page vii for a list of other required and recommended publications.
Who Should Read This Book
This road map is for anyone who is considering an upgrade for an iSeries server or is involved in migrating data from one RISC model to another RISC model. This audience includes:
vCustomers
vHardware services personnel
vSoftware services personnel
vBusiness partners
vMarketing representatives
Everyone involved in the model upgrade or data migration needs to know all of the information in this book.
Each customer should have a Customer Account Team Leader. This team leader can be a Hardware Service Representative, Software Service Representative, Business Partner, or Marketing Representative. The Availability Center usually assigns a Customer Account Team Leader.
Conventions and Terminology Used in This Book
This road map identifies activities, programs, tools, and references that you can use to upgrade the model.
As you read this book, you should be aware of the following terms:
vThe terms source system and target system are used throughout this manual. The source system is the system you are upgrading from. The target system is the system you are upgrading to.
vThe term Marketing Representative can mean either an IBM Marketing Representative, a Business Partner, or a Services Specialist.
vThe term 1xx includes Model 150 or 170.
vThe term 2xx includes Model 250 or 270.
vThe term 4xx includes Model 400, 40S, or 436.
vThe term 5xx includes Model 50x, 50S, 510, or 530.
vThe term Sxx includes Model S10, S20, S30, S40, SB1, SB2, or SB3.
vThe term 6xx includes Model 600, 620, 640, or 650.
vThe term 7xx includes Model 720, 730, or 740.
vThe term 8xx includes Model 820, 830, or 840.
vThe term iSeries or iSeries 400 as used in this document refers to the new generation of (previously AS/400) systems and servers positioned for
vThe term iSeries server as used in this document refers to:
???iSeries system- Models 40x, 5x0, 150 and 6x0.
???iSeries server- Models 40S, 5xS, Sxx, 170, 2xx, 7xx and 8xx.
vThe term System Products Division (SPD)
In this publication, the version, release, and modification levels are shown in a shortened form:
Is used in this book to indicate that a step, or process may cause loss of data.
Namely: Installing incorrect versions of the operating system.
CAUTION:
Is used in this book to indicate possible damage to the system. Namely: Static damage to component.
DANGER
Is used in this book to indicate possible damage to the users and equipment. Namely: Electrical shock.
In any position that contains numerals, an x = any supported value, for example
SFxxxxx, or VxRxMx.
Examples of displays might contain only pertinent information to a topic. So, some display examples do not show all text and lines, especially blank lines.
vi iSeries 940x
Prerequisite and related information
Use the iSeries Information Center as your starting point for looking up iSeries and AS/400e technical information. You can access the Information Center two ways:
vFrom the following Web site: http://www.ibm.com/eserver/iseries/infocenter
vFrom
iSeries Information Center,
The iSeries Information Center contains advisors and important topics such as CL commands, system application programming interfaces (APIs), logical partitions, clustering, Java, TCP/IP, Web serving, and secured networks. It also includes links to related IBM Redbooks and Internet links to other IBM Web sites such as the Technical Studio and the IBM home page.
With every new hardware order, you receive the following
viSeries 400 Installation and Service Library,
viSeries 400 Setup and Operations
Your
vThis book. The online version of this book is on the iSeries Information Center http://www.ibm.com/eserver/iseries/infocenter
under the System Planning and Installation topic.
viSeries Information Center,
vSoftware Installation,
System planning and installation
vPhysical Planning in the iSeries Information Center under Getting Started with iSeries
vGetting started with iSeries topic under System planning and installation in the Information Center.
vThe Backup and Recovery manual is available in PDF format from the iSeries Information Center (under Systems Management
viSeries Model 270, 8xx, SB2, and SB3 System Installation and Upgrade,
viSeries 400 Model 830, 840, SB2 and SB3 Problem Analysis, Repair and Parts,
viSeries 400 Model 270 and 820 Problem Analysis, Repair and Parts,
vOperations Console Setup,
iSeries 940x
For information about Logical Partitioning, see the LPAR web site at:
www.as400.ibm.com/LPAR
For information about working with PTFs, see the Managing fixes topic in the Information Center under System planning and installation
For information about other AS/400 publications (except Advanced 36), see the following:
vPrior to V4R4, the Publications Reference,
vThe AS/400 Information Directory is a unique, multimedia interface to a searchable database. It contains descriptions of titles available from IBM or from other selected publishers. It comes with the OS/400 operating system at no extra charge.
viSeries Information Center: Supplemental Manuals,
An upgrade might require the use the following publications:
vOperations Console Setup,
vBEST/1 Capacity Planning Tool,
vLPS: OnDemand for AS/400,
vOptiConnect for OS/400,
Operations Navigator
IBM Operations Navigator is a powerful graphical interface for managing your iSeries 400 servers. Operations Navigator functionality includes system navigation, configuration, planning capabilities, and online help to guide you through your tasks. Operations Navigator makes operation and administration of the server easier and more productive and is the only user interface to the new, advanced features of the OS/400 operating system. It also includes Management Central for managing multiple servers from a central server.
For more information on Operations Navigator, see the iSeries Information Center.
How to send your comments
Your feedback is important in helping to provide the most accurate and
vIf you prefer to send comments by mail, use the readers??? comment form with the address that is printed on the back. If you are mailing a readers??? comment form from a country other than the United States, you can give the form to the local IBM branch office or IBM representative for
vIf you prefer to send comments by FAX, use either of the following numbers:
???United States, Canada, and Puerto Rico:
???Other countries:
vIf you prefer to send comments electronically, use one of these
???Comments on books:
RCHCLERK@us.ibm.com
??? Comments on the iSeries Information Center:
RCHINFOC@us.ibm.com
viii iSeries 940x
Be sure to include the following:
vThe name of the book or iSeries Information Center topic.
vThe publication number of a book.
vThe page number or topic of a book to which your comment applies.
iSeries 940x
x iSeries 940x
Chapter 1. Overview of
Migrations
The road map lists important considerations and activities that are critical to the successful model upgrade of a system. Although this road map is not designed to be an all inclusive
This road map also covers how to perform a model to model data migration. A data migration can be performed from almost any iSeries 400 model to any model. The source model must be at the same release as the new model to correctly complete the data migration. Data migration involves a new system with a new serial number.
For an overview of the
What is in this Road Map?
This road map covers the following
Note: The current system may require hardware upgrades or configuration changes to satisfy capacity and compatibility requirements of new software and hardware.
vIBM AS/400 Model 170 to IBM AS/400 Model 170
There are no upgrades into or out of a Model 170. The Data Migration section of this book covers the procedure used to perform a data move from the source system to the new iSeries model.
vIBM ~iSeries Model 270 to IBM ~iSeries Model 270
There are no upgrades into or out of a Model 270. The Data Migration section of this book covers the procedure used to perform a data move from the source system to the new iSeries model.
vIBM AS/400 Models 5xx to IBM AS/400 Models 7xx
vIBM AS/400 Models 6xx to IBM AS/400 Models 7xx
vIBM AS/400 Models 7xx to IBM AS/400 Models 7xx
vIBM AS/400 Models Sxx or IBM AS/400 Models 5xx to IBM ~iSeries
Models 8xx
There are no model upgrades into a Model 8xx from a Model 5xx, 6xx, Sxx, or SBx. However, some hardware may be moved from the 5xx into a migration I expansion unit (I/O and disk unit). The Data Migration section of this book covers the procedure used to perform a data move from the source system to the new iSeries 400 model.
vIBM AS/400 Models 6xx to IBM ~iSeries Models 8xx
vIBM AS/400 Models 7xx to IBM ~iSeries Models 8xx
vIBM ~iSeries Models 8xx to IBM ~iSeries Models 8xx
Contact your local IBM representative or authorized dealer for additional information on permitted upgrades.
For servers that do not have an upgrade path, use the data migration section of this book. This would include scenarios such as an AS/400?? Model 540 to an iSeries 400 Model 270.
Why Upgrade from one AS/400 or iSeries 400 Server to Another iSeries 400 Server?
You might ask yourself why IBM is doing this and why upgrade your server now? Most customers need to increase performance and add capacity.
What is an Upgrade?
In this book, an upgrade is any improvement made to the software or the hardware of an iSeries 400 or AS/400 model that retains the serial number of the iSeries 400 or AS/400 model. This includes moving the compatible hardware, the Licensed Internal Code, operating system, and the licensed programs to a new target system for better performance and reliability.
A data migration is the process of moving only the data from one iSeries 400 or AS/400 model to a new iSeries 400 model, with a new serial number.
Upgrade process flow
The following flow chart describes each step of an MES upgrade and lists the required outputs for each stage.
2 iSeries 940x
Hardware Investment for Upgrading
You may choose to upgrade your existing RISC system processor, or replace it with a new iSeries 400 model. In either case, you may keep most of the current system. The process of either an upgrade of your existing system or moving parts from an existing system to a new system, are called miscellaneous equipment specification (MES). MES denotes the process steps of an upgrade. The type of MES depends on several factors:
vYour current processor model
vCosts
vYour system availability requirements
The information in this book will help to determine the right path to an upgrade. This is based on the current model and the goals of the process.
How Long will the Upgrade Take?
The upgrade process includes planning, ordering, shipping, installing and testing the system. The following table shows approximately how long an upgrade might take.
Note: You should plan at least one additional hour of down time to load the operating system for systems not preloaded.
What is a Data Migration?
A data migration is the process of moving the OS/400?? and the data from one model iSeries 400 or AS/400 to a new model iSeries 400 AS/400.
The source system must be at the same release level as the target server. This includes OS/400, all objects, and all licensed programs.
For customers ordering a new RISC iSeries 400 server with V4R4 or V4R5 to replace an existing RISC iSeries 400 or AS/400 model (???source???) and needing to migrate their data from the ???source??? model to the new server, a new feature code Feature Code (F/C) #0205, is now available. This new feature code should be ordered against the new RISC iSeries 400 server. It is valid on orders for all new servers except the Models 150 and SB1.
Chapter 1. Overview of
For Feature Code #0205, the customer must have purchased a new server with enough hardware and disk unit to hold all of the data from the ???source??? model as well as any new data including any required IBM software (OS/400 and so forth). Additionally, the
Customers with Version 3 (V3R7) on their ???source??? model must upgrade to Version 4. It is recommended that they purchase Software Subscription for AS/400. They must then order and upgrade to match the new server (V4R4 or V4R5) in order to proceed with their data migration. V3R7 cannot be directly upgraded to V4R4 or V4R5 therefore, to do this the source system will need to be upgraded to V4R2 or V4R3 before upgrading to V4R4 or V4R5. Customers with Version 4 must obtain new server release of OS/400 licenses of the LPPs, either through new orders or via Software Subscription for AS/400.
A License Addendum will be provided to allow the customer to install and use the copy of OS/400 (received with the newly ordered server) on their source model for up to 70 days. This Addendum authorizes the customers to use the new Version and Release on the source system for the sole purpose of migrating their data. The previous Version and Release must be reinstalled after the migration is completed. The V4R4 or V4R5 licenses of OS/400 and the LPPs will only allow the products to be run on one system at a time. Model 150 customers who are not at the new server release of OS/400 must purchase the BasePak Upgrade
Feature Code #0205 differs from Feature Code #0203. Feature Code #0203 SHOULD NOT be ordered for iSeries 400 or AS/400
Data migration process flow
The following flow chart describes each step of a data migration and lists the required outputs for each stage.
4 iSeries 940x
How Long will the Data Migration Take?
The data migration process includes planning, ordering, shipping, installing and testing the system. The following table shows approximately how long a data migration might take.
Note: You should plan at least one additional hour of down time to upgrade the operating system for source systems not at the new server release level.
Books to Use for Software Release Upgrades
The following table lists software release considerations, and which book to use for upgrading the operating system and licensed programs.
Chapter 1. Overview of
Hardware and software
Note: V4R4 introduced logical partitions. Go to the iSeries Information Center for help with setting up, upgrades to, and maintaining logical partitions.
See the Software Installation manual for other software requirements and limitations prior to the OS/400 upgrade.
6 iSeries 940x
Chapter 2. Planning Your Order for Upgrading or Data Migration
Review this chapter as you identify a solution and again after a decision is made to verify the accuracy and completeness of the order. After you finish reviewing this chapter, you should have the following:
vFinal software order
vFinal hardware order
vFloor layout
v
vCable labelling of source system
vSite requirements defined
Refer to the ???Upgrade process flow??? on page 2 or ???Data migration process flow??? on page 4, depending on your situation, to identify where Planning is in the overall process.
Determining Your Upgrade Needs
To help determine the upgrade needs, please consider the following:
vWhat problems does this upgrade need to address?
vWhat additional applications or growth do you expect or plan for in the future?
vWhat new technology do you want as part of the upgrade?
vWhat are the requirements for the following:
???Capacity
???Capability
???Performance
???Availability
vWhat are your expectations for the following:
???Impact on business operations
???Cost
???Performance
vWhat are the financial considerations to keep in mind? For example:
???Government discounts
???Capital planning cycles
???Tax implications
???Budget
Performance Tools for Capacity Planning and Performance Analysis
The licensed program Performance Tools/400 (Program
The BEST**/1 Capacity Planning function of the Performance Tools licensed program provides the capability to analyze how a different AS/400 or iSeries 400
configuration will perform with your current workload. The program temporary fixes (PTFs) are now available that include capacity planning information for the PowerPC processor models of the system. You can use Performance Tools to help you determine the proper configuration of the processor main storage, and disk resources that will meet your performance requirements.
Performance Tools are the best source of information for determining what configuration meets your performance requirements. You should order the PTF that updates your version of Performance Tools with the PowerPC AS processor models.
Note: If you do not have Performance Tools on your system, you should obtain modeling information in another way, such as by using consulting services. Modeling the characteristics of your target configuration helps ensure that the configuration meets your needs.
The latest PTFs for AS/400 BEST/1 Capacity Planner are required. You can order or download these PTFs from the following Web site:
http://as400service.ibm.com
You need to register at this site. Do the following to go to the Internet PTF Facility:
1.Click Fixes, Downloads and Updates
2.Click Internet PTF Downloads (iPTF)
How to Gather Configuration Information
You and your marketing representative use the MRPD (Machine Reported Product Data) and the IBM Configurator for
Machine Reported Product Data (MRPD)
The hardware and software inventory of a system can be transmitted to IBM and stored in databases there. Once the information has been captured, it can be accessed by the marketing representative to establish a starting point for a system upgrade. The data may also be used for problem determination by hardware and software support centers.
The data can be sent to IBM with these tools:
vManually, with the WRKORDINF command. The WRKORDINF command sends the information once through the Electronic Customer Support line.
vAutomatically, with Service Agent and Management Central. Service Agent can be customized to automatically transmit the data regularly on a monthly basis.
How to Gather Performance Information
Gathering performance data before installing a release gives you a base with which to compare your system???s performance after the installation is complete. Performance data is also useful when determining the correct hardware configuration for your upgrade.
To gather performance information before you install a release, see the Prepare for software installation topic in the Information Center under System planning and installation
8 iSeries 940x
Prerequisites Before Placing an Order
This section will cover the prerequisites of placing an order to upgrade the system. These include
You may also need information about logical partitioning. Refer to the web site:
www.as400.ibm.com/LPAR
Version 4 Software Items
See the table on supported releases for software upgrades in the book Software Installation,
The ???Preparing Program Temporary Fixes Required Before Installing V4R5M0
Software??? section in the Software Installation book describes how to apply PTFs.
Other Software Related Items
vDetermine whether there are any additional software charges that are associated with the processor group change. Two passes must be run on the iSeries 400 configuration program to determine these changes.
vDetermine whether there are any additional usage changes because of the
vVerify with the software service representative, or the business partner, that any third party software that you use was tested on the software release level ordered.
vContact the software service representative for any software considerations and restrictions that might apply to the model upgrade.
Notes:
1.If you have tape management software, ensure that it uses support that is available on your target system. Do the following:
a.Type DSPOBJD OBJ(QSYS/QUSTAPEX) OBJTYPE(*PGM)
b.If you receive the message Object QUSTAPEX in library QSYS type *PGM not found, you do not have this potential problem with tape management software.
c.If you see the Display Object Description display for the QUSTAPEX program, press F12 (Cancel). Contact the vendor who supplies your tape management software to determine how the vendor will provide equivalent support for your target release.
You may need to order an OS/400 feature called MSE (Media and Storage Extensions).
2.For other software related questions, see Technical Studio and the book Software Installation,
Hardware Considerations
vEnsure that a PC has been properly configured as an Operations Console.
vDetermine the prerequisite engineering changes and program temporary fixes (PTFs) that are needed to upgrade the system.
vDetermine the attached
Chapter 2. Planning Your Order for Upgrading or Data Migration 9
vVerify with the original equipment manufacturer vendor that any
Note: The customer should request written confirmation of this compatibility from the original equipment manufacturer vendor.
vThe target system may have different power requirements than the source system. Appropriate planning and preparation by the customer is very important. Determine whether you need additional space and power requirements for any additional system units or system racks. For more information, see Technical Studio at http://www.iseries.ibm.com/tstudio/planning/plngstrt.htm.
vVerify that the target system has a tape drive compatible with the tape format used to save information on the source system.
vEnsure that your marketing representative or IBM business partner is aware of the number of ports on your current twinaxial workstation controllers and the number of ports you will need on your new model. This will help to ensure that the proper model and features get ordered for your upgrade.
vEnsure that you label the cables of your current system before the upgrade. To do this, see the Physical Planning guide in the iSeries Information Center under
Getting Started with iSeries
http://www.ibm.com/eserver/iseries/infocenter
System Configuration Considerations
vWhen implementing changes to the auxiliary storage pool (ASP) configuration, do it either before or after the upgrade, but never during the upgrade.
vIf you use mirroring, make sure to specify the correct level.
vA current system configuration list should be available for the hardware service representative. The configuration list provides details of your current system configuration.
To print the System Configuration List, do the following:
1.On the OS/400 Main Menu command line, type STRSST. Then, press the Enter key.
2.Type QSECOFR on the System Service Tool Sign on display and press Enter.
3.On the STRSST display, select Start a service tool option. Press the Enter key.
4.On the Start a Service Tool display, select Hardware service manager. Press the Enter key.
5.From the Hardware Service Manager display, press F6 (print configuration).
6.To return to the OS/400 Main Menu, Press F3 (Exit) twice, and then press the Enter key.
7.Keep the printed list - the service representative will need it.
Services and Other Assistance
vDetermine whether you need
???IBM Global Services
???iSeries 400 and AS/400 Data Migration Services
???LPAR Planning and Implementation Services
???iSeries Planning and Migration Services
???AS/400 System Migration Services
10 iSeries 940x
???Related support services
???iSeries 400 and AS/400 solution services
v Determine the responsibilities for all upgrade activities. These responsibilities include:
???Outline the model upgrade activities and the person responsible for each activity, as described in Table 4 on page 17.
???Develop an installation plan, a schedule of activities, and a checklist. See the SA Advisor in the Expert menu Application on HONE.
Your IBM Representative may visit the Solutions Assurance Web site: http://w3.ibm.com/support/assure
Your IBM representative can use marketing tools to get more information:
-Only your IBM representative can access MKTTOOLS at this Web site:
-Or on a Virtual Machine (VM) system, the representative types:
TOOLS SENDTO LEXVMIC1 TOOLS SAPRDOC GET SA95008 SCRIPT * TOOLS SENDTO LEXVMIC1 TOOLS SAPRDOC GET SA95008 LIST3820 *
vOrder any optional hardware and software publications by using PUBORDER or the System Library Subscription Service (SLSS).
vDetermine whether you have any education needs.
There are unique
vThe prerequisite for migrating SPD
vThere is concurrent disk unit maintenance.
vYou can use the alternate IPL device function for any installation or recovery that requires replacing Licensed Internal Code or other licensed programs. Some models might require an alternate installation device. You can use this device for installing distribution tapes that were created by a central site, or for recovery, using a SAVSYS tape. The Appendix about alternate installation devices of the Software Installation manual describes the alternate installation device function and identifies situations in which older tape devices may require its use. The Appendix also describes how to set up, enable, or disable an alternate installation device. A PDF version of this manual is available from the iSeries Information Center under System planning and installation
Hardware and software
Note: In Models S10, S20, 600, 620 and 720, the
vModels Sxx and 6xx have a new
Chapter 2. Planning Your Order for Upgrading or Data Migration 11
vBe aware that upgrades to an AS/400 or iSeries server may require wiring changes to a building. For more information, see Technical Studio at http://www.iseries.ibm.com/tstudio/planning/plngstrt.htm.
The customer should work with the marketing representative to schedule a system assurance meeting to review all of the following activities.
Note: This meeting should include the customer, IBM marketing representative, hardware service representative, software service representative, and any
vReview memory considerations as follows:
???
???Main storage for AS/400 Models 400??, 500, and 530 is not compatible with each other.
???Main storage for AS/400 Models 40S, 50S, and 53S is not compatible with each other.
???You must plug in main storage cards in
???You must plug in main storage cards in
vEnsure that you know how to accomplish RAID protection on a migrated internal disk unit. You must have an attachment to a Feature Code for a high availability DASD controller (for example, 6502, 6512, 6532, 2726, or 2740).
Note: In order to avoid additional charges for the IBM service representative???s time, perform ASP management after completion of the hardware upgrade.
vBe prepared to delete the old device description and create a new one, if the type of console changes.
vReview and confirm the hardware and software order.
vSome systems have a mix of unsupported disk unit devices. If the system has such a mix, consider one of the following:
???Purchase additional supported disk unit devices in order to enable the removal of all unsupported devices before the model upgrade.
???Purchase AS/400 Data Migration Services.
Upgrading from a 4xx, 5xx, Sxx, or 6xx to a 7xx
Many installed AS/400 Models 4xx, 5xx, 6xx, and Sxx (except SB1) can be upgraded to an AS/400 Model 7xx.
All system units and expansion units have locations for features including processors, main storage, power, expansion units, disk units, tape drives,
12 iSeries 940x
of these features. It should be used to ensure a valid configuration. The use of performance tools may also help in optimizing a configuration to match a specific set of requirements.
Note: When ordering a model upgrade from a
Sxx Interactive Specify codes that the configurator will add:
vModel S20 Interactive Specify codes
???1490
???1492
vModel S30 Interactive Specify codes
???1492
???1493
???1494
vModel S40 Interactive Specify codes
???1495
???1496
Migrating from a 5xx to an 8xx
When migrating SPD expansion units from an AS/400 Model 5xx or from any unsupported path to an iSeries Model 8xx, the order must have a migration expansion unit included.
IBM does not provide a
vSPD I/O expansion unit can not be directly attached to an 8xx. A migration expansion unit with SPD capability is required. If you have a Model 830 or 840 and do not have a migration expansion unit yet, a migration expansion unit (migration expansion unit II), FC #5077 (and perhaps an FC #5057 expansion unit), should be ordered. IBM does not offer an option to order a migration expansion unit (migration expansion unit I) which could attach to an 820.
vSPD IOPs can not be inserted into an 8xx except via SPD slots in a migration expansion unit or in SPD I/O expansion unit attached via a migration expansion unit.
vNot all I/O is supported by V4R5 or V5R1 on an 8xx. There were several older disk units, tape drives, IOPs, and so forth, which were no longer supported as of V4R1.
vThe I/O expansion unit, on a Model 500 or 510 only has a 266 Mbps Optical bus Adapter which is too slow for the migration expansion unit to support. Using the S40388 RPQ, the expansion unit can be converted to a faster I/O expansion unit with a 1063 Mbps Optical Bus Adapter.
vSince V4R5, the only type of PC console that an 8xx system supports is Operations Console.
Chapter 2. Planning Your Order for Upgrading or Data Migration 13
vPlanning assistance from IBM Global Services or from an IBM Business Partner may be very helpful if this is an unfamiliar area to the customer.
Upgrading from a 6xx or 7xx to an 8xx
Many installed AS/400 Models 6xx and 7xx, except SB1, can be upgraded to an iSeries 400 Model 8xx. 8xx models require V4R5 or later versions of OS/400 depending on the hardware function required.
All system units and expansion units have locations for features including processors, main storage, power, expansion units, disk units, tape drives,
Placing the Upgrade Order
After you have identified what is necessary for the upgrade, continue with the following sections:
Who is Responsible for Ordering the Upgrade?
The following tables show a
Note: IBM Services personnel may perform the customer activities for a fee.
Table 1. Tasks and Responsibilities for Ordering
14 iSeries 940x
Table 2. Tasks and Responsibilities for Ordering Software
Contact your local IBM representative or authorized dealer to place the order or for further assistance.
How to Get Help with the Order
Ordering assistance is available from IBM. When you type GO ORDER on the command line and press the Enter key, the Request Order Assistance display appears.
Note: If you need assistance when trying to place an order, you can also use the Request Order Assistance (RQSORDAST) command to request assistance from IBM.
Use the Request Order Assistance display as follows:
vType in your telephone number and your name.
vVerify the accuracy of other contact information.
vPress the Enter key.
vType a short description of your needs.
vPress F10 (send) to send the file to IBM.
Sending the Order to IBM
The RQSORDAST command can send a list which contains your current iSeries 400 or AS/400 system configuration, with your order. IBM uses this list to assess your ordering needs.
Sending the Order to a Software Service Provider Other Than
IBM
You can send your order request to IBM or to a provider other than IBM. When you send your order request to a provider other than IBM, you can use the RQSORDAST command to communicate with the provider. The provider can send
Chapter 2. Planning Your Order for Upgrading or Data Migration 15
you a response electronically. You can use the WRKORDRQS command to view the response and manage the order request. The provider will fill your order or forward your request to IBM.
16 iSeries 940x
Chapter 3. Procedure for an Upgrade
After you finish reviewing this chapter, you should have performed the upgrade tasks and obtained the outputs outlined in the ???Upgrade process flow??? on page 2 (except for the planning tasks and outputs already covered in ???Chapter 2. Planning Your Order for Upgrading or Data Migration??? on page 7).
Who is Responsible for Upgrading the System
The following table establishes a
IBM Services can be provided for additional cost to assist customers.
For customer install systems and servers such as Model 170, follow the instructions that came with the system.
Table 4. Tasks and Responsibilities for the Upgrade Path
Table 4. Tasks and Responsibilities for the Upgrade Path (continued)
What to Do When the Hardware Arrives
When the hardware arrives, the customer should notify the hardware service representative and schedule a time for system assurance checkpoint prior to the hardware installation (MES upgrade).
Notes:
1.For customer install systems follow the instructions that came with your server to get set up. If you are replacing an existing system while preserving the original serial number, use the data migration section of this book.
2.The customer must have at least 64MB of memory or arrange to have additional memory installed before the upgrade can proceed. For more information on prerequisites prior to an upgrade, see the manual Software Installation,
Hardware and software
Preparing the Current System
In this section, you will be asked to save your system several times. IBM strongly recommends that you save your system when instructed to do so. Saving your system allows you to have recovery data in case of disaster.
Approximately two weeks before the hardware service representative arrives, the customer should do the following:
__ 1. Acquire the preventive service planning information (see ???Appendix C. Obtain the Latest Preventive Service Planning Information??? on page 43) from electronic customer support, if available, or from the software service representative.
__ 2. For information pertaining to logical partitions, see the Logical Partitions topic under Systems Management in the iSeries Information Center. There are some specific steps to perform for upgrading a server with primary and secondary partitions installed.
__ 3. For considerations when upgrading to
18 iSeries 940x
This is where you load the new operating system.
__ 7. See the manual Software Installation,
Important: If you are using logical partitions, update all your partitions to V5R1, if needed.
__ 8. Delete any unused device configuration descriptions (delete unused line, line descriptions, and
Important: To delete line and device and descriptions, use the WRKLIND and WRKDEVD commands and verify that all the descriptions listed are in use. If you are sure one is not, you should delete it. If you are not sure, you should leave it.
Table 5. Clear
__ 9. Before proceeding with the next step, make that sure during step 7, you obtained or performed the following:
a.OS/400 is current (You determined whether you needed to replace software and replaced Licensed Internal Code, operating system, and licensed programs if needed.)
b.PTFs are current
c.Saved your current system (recommended as recovery data in case of disaster)
__ 10. If you do not have a current system backup that allows you to recover in case of disaster, save the entire system on each partition. Make sure that you save the system and data on a tape unit that is compatible with the tape unit on the target system. To save the system, use option 21 on the Save menu. For more information about saving the entire system using option 21, refer to any of the following:
vThe chapter on saving your iSeries server in the manual Backup and Recovery,
Chapter 3. Procedure for an Upgrade
the Information Center under Systems Management
vThe Backup, recovery, and availability topic under Systems Management in the Information Center:
http://www.ibm.com/eserver/iseries/infocenter
To find the procedure for saving the entire system (using option 21) in the Information Center, do the following:
a.Click Systems Management
b.Click Backup, recovery, and availability
c.Click Backing up your server
d.Click Saving your server with the GO SAVE command
e.Click Saving your whole server with GO SAVE: Option 21
__ 11. Resume normal system operations and processing.
__ 12. To verify that all your applications are running properly, use the system with the new software release until you feel comfortable with the new production environment. For example, many customers use the system for 2 weeks or longer.
Preparing for System Assurance prior to hardware upgrade
Before the hardware upgrade is to take place, the customer should do the following:
__ 1. Ensure that the currently installed machine and LPAR partitions are documented.
20 iSeries 940x
__ 2. Print Disk Configuration Status of the installed system.
__ 3. Print Parity Set Configuration and Status of the Installed system.
__ 4. If you do not have a current system backup that allows you to recover in case of disaster, save the entire system on each partition just before the hardware upgrade is to be started. Make sure that you save the system and data on a tape unit that is compatible with the tape unit on the target
Chapter 3. Procedure for an Upgrade
system. To save the system, use option 21 on the Save menu. For more information about saving the entire system using option 21, refer to any of the following:
vThe chapter on saving your iSeries 400 server in the manual Backup and Recovery,
vThe Backup, recovery, and availability topic under Systems Management in the Information Center:
http://www.ibm.com/eserver/iseries/infocenter
To find the procedure for saving the entire system (using option 21) in the Information Center, do the following:
a.Click Systems Management
b.Click Backup, recovery, and availability
c.Click Backing up your server
d.Click Saving your server with the GO SAVE command
e.Click Saving your whole server with GO SAVE: Option 21
__ 5. Enter the command WRKDSKSTS OUTPUT (*PRINT) to get disk configuration and protection information. Use this printout to help analyze the disk unit configuration and protection.
If you want a different configuration after the upgrade, use this printout to plan for the desired configuration. Before you power down the system to perform the hardware upgrade, you must logically remove any disk unit that you will move during the upgrade.
__ 6. Use the Retrieve Configuration Source (RTVCFGSRC) command for the existing line, controller, and device descriptions. The configuration source is needed if any configuration objects must be manually changed or
DSPHDWRSC TYPE(*LWS) OUTPUT(*PRINT)
DSPHDWRSC TYPE(*STG) OUTPUT(*PRINT)
DSPHDWRSC TYPE(*CMN) OUTPUT(*PRINT)
DSPHDWRSC TYPE(*PRC) OUTPUT(*PRINT)
Make certain that the printouts are marked as to which partition they represent.
__ 7. Run the WRKHDWPRD command, option 4 to display and verify the information. Use F17 to print the information for the service representative.
__ 8. Print the LPAR configuration
22 iSeries 940x
__ 9. Print the status of all PTFs on the system (each system partition if LPAR) after installing the V5R1 software and before the hardware upgrade. Type the following command:
DSPPTF LICPGM(*ALL) OUTPUT(*PRINT)
System Assurance Checkpoint
The customer needs to ensure that the following is completed before the hardware service representative arrives:
1. Verify that the physical planning items were completed:
vHigh Speed Link cable diagram
vFloor plan, system layout diagram
vCable labelling
To complete the items, see the Physical Planning in the iSeries Information Center under Getting Started with iSeries
http://www.ibm.com/eserver/iseries/infocenter
2.Ensure that you have installed the latest V5R1 cumulative PTF package and specific software release PTFs on all partitions. Refer to step 7 on page 19.
3.Verify that you have the latest full system backup (Save option 21) tapes on hand and labeled. Refer to step 4 on page 21.
4.Verify the availability of a compatible alternate IPL device
Note: If a tape unit is attached to a bus other than the system bus 1, record the following information about the tape unit location:
vType and model
vSystem bus
vSystem card
This information is necessary to set up and enable the tape unit as an alternate installation device. For more information about alternate installation devices, go to the Software Installation manual. A PDF version of this manual is available from the iSeries Information Center under
System planning and installation
Software and licensed programs
5.Ensure that the console device is available and ready. For information about setting up and configuring Operations Console, see the manual Operations Console Setup,
6.Verify that you have the following printouts on hand (refer to step 1 on page 20 through step 9):
v Latest system configuration list
vLatest device descriptions printout on hand
vLatest controller descriptions printout on hand
vLatest PTF level printout on hand
vLatest complete and accurate label location chart or worksheet on hand
Chapter 3. Procedure for an Upgrade
7.Verify that prerequisite hardware changes are installed or are available to install on all system components and input or output devices.
8.Document the IPL status for all your partitions. Then, set the IPL System Action for each Secondary Partition:
9.As appropriate, confirm the schedule for the hardware upgrade.
10.If you do not have a current system backup that allows you to recover in case of disaster, save the entire system on each partition just before the hardware upgrade is to be started. Make sure that you save the system and data on a tape unit that is compatible with the tape unit on the target system. To save the system, use option 21 on the Save menu. For more information about saving the entire system using option 21, refer to any of the following:
vThe chapter on saving your iSeries server in the manual Backup and Recovery,
vThe Backup, recovery, and availability topic under Systems Management in the Information Center:
http://www.ibm.com/eserver/iseries/infocenter
To find the procedure for saving the entire system (using option 21) in the Information Center, do the following:
a.Click Systems Management
b.Click Backup, recovery, and availability
c.Click Backing up your server
d.Click Saving your server with the GO SAVE command
e.Click Saving your whole server with GO SAVE: Option 21
Installing the Hardware for the
The hardware service representative should do the following:
1.Participate in the system assurance checkpoint (refer to ???System Assurance Checkpoint??? on page 23).
2.Perform the model upgrade.
3.Prepare any parts that need to be sent to IBM.
4.Perform any contracted relocation or rearrangement services prior to returning the system to the customer for their use.
5.Perform normal cleanup and housekeeping tasks. This includes proper reporting of time and activities, including any
6.Provide the customer with critical resource documentation.
Managing your new system I/O resources
After the hardware is installed, the customer should do the following:
24 iSeries 940x
In the next few steps the customer will be required to use the information from the service representative to finish the resource management on the new server. The goal of these steps is to ensure the server is set up and running to the customer???s needs. You will be asked to save your system. IBM strongly recommends that you save your system when instructed to do so. Saving your system allows you to have recovery data in case of disaster.
__ 1. Ensure that you received the source system???s label locations printout from the hardware service representative (refer to step 7 on page 22). This is used to get the hardware resources correctly assigned to resource names.
__ 2. Continue the initial program load (IPL) by selecting option 1 from the IPL or Install the System screen.
Notes:
a.You might see a disk unit format optimize warning message. IBM suggests that you handle this disk optimization and protection later. See step 8 on page 30.
b.If the Add All Disk Units to the System ASP screen appears, IBM recommends that you wait and add the disk units at step 3 on page 29.
Note:
Changing the QIPLTYPE system value may result in receiving the system reference code (SRC) A900 2000.
Chapter 3. Procedure for an Upgrade
__ 6. Vary off all devices, except the display station in use as the console. Use the WRKCFGSTS *DEV command to display a list of devices. Note that the console is assigned to the QCTL controller.
__ 7. Use the WRKCFGSTS *CTL *ALL command to ensure that all controllers are varied off.
__ 8. Use the label location worksheet to assist you with the upgrade process. On it, the service representative should have indicated controllers (and devices) that are in different locations than they were on your source system. You must correct resource names to be able to access the devices on your system.
__ 9. Run the WRKHDWPRD command to determine whether devices are in different locations than they were on the source system.
a.On the command line, type WRKHDWPRD and press the Enter key.
b.On the Work with hardware products display, select the Change description label locations option. Press the Enter key.
c.Read the information on the Using Change Label Locations display and press the Enter key.
d.Compare the label information on the display with the source system???s label locations. The source system???s label locations should have been written down before the hardware upgrade took place (see step 7 on page 22). Label information matches if the Label column on the display matches what the source system had. Label information does not match if any one of the following is true:
vThe display has label information, but the source system did not have label information in that location.
vThe source system label information does not match the information found in the Label column on the display.
v*NONE appears in the Label column on the display, and there is label information for the source system.
Note: When *NONE appears in the Label column for a controller or device that was added or upgraded, select option 2. Then select the correct label description from the list provided. If any problems arise from this, call your service provider.
v*INCORRECT or *INVALID appears in the Label column.
This means that the type and model number of the hardware resource information does not match the type and model of the configuration description that is currently associated with that resource. The system cannot vary on the configuration description.
v*INCORRECT ??? where the physical location is also ???**???.
This identifies a controller or device description that no longer has a valid resource on the system.
e.Do you have any locations that do not match the label information on the system?
Note: It is normal for the resource names to change during the upgrade process. Do not use the resource name information from other displays to match the labels.
YES - Go to step 9f on page 27.
26 iSeries 940x
NO - The system label information is the same as the (physical) label. Go to step 10.
f.On the Change Description Label Locations display, type 2 in the Opt column for each location that requires a label change. Press the Enter key.
Note: You may make more than one selection at a time, but if More...
appears on the bottom of the display, do not press the Enter key. Page forward to select the remaining labels.
g.The Change Description Label display appears.
A list of possible label names is shown. To select the label name (on the display) that matches the label that was on the source system, perform the following:
v Type 1 in the Opt column for each location that you want to change.
vPress the Enter key.
Note: If you cannot find the label (on the display) that matches the label on the source system, contact your hardware service representative.
h.If you chose to change more than one item, the Change Description Label display appears for the next label. A message at the bottom of the display indicates whether the previous change was successful.
i.For all the labels that need a change, repeat the previous three steps.
j.After you change the last label, the Change Description Label Locations display appears with the updated information. A message at the bottom of the display indicates whether the last change was successful. If More... appears on the bottom of the display, scroll forward to view more information.
k.Press the F17 key on the Change Description Label display to request a printout of the new information for your records.
Note: The printout will be in the default output queue for your workstation. You can print it later when you vary on your printer devices and start printer writers.
l.Verify that the labels on the printout match the labels in the Label column on your source system. If you find any errors, go back to step 9f and repeat the steps.
Attention: Do not exchange cards for problem analysis purposes. Card and device serial numbers are tied to the system configuration.
__ 10. The Change Description Label Locations display appears. Determine whether the new target system has more storage or communications lines than the source had. If that is the case, check the work management objects. To do this, see the Work management topic under Systems Management in the Information Center.
Chapter 3. Procedure for an Upgrade
Performing a new system backup
__ 1. Perform a normal IPL:
vFor Restart after power down, *YES
vFor IPL Source,
*PANEL
SRC A900 2000 should not appear on the control panel when the IPL completes. If SRC A900 2000 does appear and you are using Operations Console, you must perform an IPL in Manual mode (M) on the system to arrive at the Dedicated Service Tools (DST). Then, in DST, set the console mode system value to Operations Console, and continue the IPL to sign on.
To set the system to manual mode, do the following:
vFor systems without logical partitions, see the Changing operating modes and IPL types topic in the Information Center under System hardware
vFor systems with logical partitions, see the Changing operating mode for a logical partition topic in the Information Center under Systems
Management
28 iSeries 940x
To set the console mode to Operations Console at DST, do the following starting at the DST main menu:
a.Select Work with DST environment.
b.Select System devices.
c.Select Console mode.
d.Depending on your Operations Console configuration, select either
Operations Console (LAN) or Operations Console (Direct).
e.Exit Dedicated Service Tools.
A normal IPL after this process should clear SRC A900 2000.
__ 2. If you want to start device parity on any
Systems Management
__ 3. Perform disk unit management (for example, manage disk protection and disk configuration). To do this, you can use the Work with Disk Units option from the Dedicated Service Tools display. For more information, see the manual Backup and Recovery,
__ 4. Save the entire system just after the hardware upgrade is done. Use option 21 on the Save menu. For more information about saving the entire system using option 21, refer to any of the following:
vThe chapter on saving your iSeries server in the manual Backup and Recovery,
vThe Backup, recovery, and availability topic under Systems Management in the Information Center:
http://www.ibm.com/eserver/iseries/infocenter
To find the procedure for saving the entire system (using option 21) in the Information Center, do the following:
a.Click Systems Management
b.Click Backup, recovery, and availability
c.Click Backing up your server
d.Click Saving your server with the GO SAVE command
e.Click Saving your whole server with GO SAVE: Option 21
__ 5. Generate reports of the hardware and configuration objects (for each partition) by issuing the following commands:
DSPHDWRSC TYPE(*LWS) OUTPUT(*PRINT)
DSPHDWRSC TYPE(*STG) OUTPUT(*PRINT)
DSPHDWRSC TYPE(*CMN) OUTPUT(*PRINT)
DSPHDWRSC TYPE(*PRC) OUTPUT(*PRINT)
DSPPTF LICPGM(*ALL) OUTPUT(*PRINT)
__ 6. Print a new system configuration list using Start a service tool option.
a.Do the following on the OS/400 Main menu command line: Type Start System Service Tools (STRSST).
Press the Enter key.
Chapter 3. Procedure for an Upgrade
b.Type QSECOFR on the System Service Tool Sign on display and press Enter.
c.Select Start a service tool option. Press the Enter key.
d.On the Start a Service Tool display, select Hardware service manager. Press the Enter key.
e.From the Hardware Service Manager display, press F6 (print configuration).
f.To return to the AS/400 Main menu, press F3 (Exit) twice. Then, press the Enter key.
g.Keep the list for future reference.
__ 7. For LPAR systems:
__ 8. If you receive the disk unit format warning screen during the first IPL (IPL started at step 2 on page 25), then the disk unit format might need to be optimized. For more information, see the manual Backup and Recovery,
__ 9. Resume normal operations and verify that all your applications run properly. IBM recommends that you tune the system performance. There are billable services available that can do this for you. You can find information about performance tuning in the Work Management manual. A PDF version of this manual is available from the iSeries Information Center under
Systems Management
30 iSeries 940x
Chapter 4. Procedure for a Data Migration
This chapter guides you through a data migration (RISC to RISC) that moves data from one iSeries model server to another. It requires two servers with unique serial numbers. To migrate data from one iSeries 400 server to an upgraded model that retains the original serial number, refer to ???Chapter 3. Procedure for an Upgrade
Prerequisites for data migration (RISC to RISC)
This procedure assumes that:
vThe target system is set up and is running, with only SLIC and the base OS installed (FC 0205) and that the DASD has been configured for ASP 1. For help with DASD configuration, you may wish to investigate the IBM billable service DASD management.
vYou have completed a
Note: Failure to obtain performance benchmarks may make it extremely difficult to provide support for your iSeries system after moving to the new model. IBM strongly recommends that you maintain performance benchmarks of your system before and after a migration.
vCompleted a recovery backup of your source system, at the previous release level.
Preparing the source system for the migration
This procedure assumes that you have:
v_ Loaded the new OS/400 version on your source system, and brought all existing objects and licensed programs to the new release level. Complete the procedure ???Preparing the Current System??? on page 18 through step 14.
v_ Set the system values, and print the current configuration.
v_ Completed a recovery backup of the source system at the new release level, and printed your latest system configuration information, including:
???Latest system configuration list from hardware service manager
???Latest device descriptions printout of the source system
???Latest controller descriptions printout of the source system
???Latest PTF level printout from the source system
v_ Run your source system at the new release level for two weeks, and completed a recovery backup. (Recommended)
v_ Have set up your new system, and/or created the new partition, including Operations Console setup (if selected in system order).
v_ Done your disk unit management (for example, manage disk protection and disk configuration). To do this, you can use the Work with Disk Units option from
the Dedicated Service Tools display. For more information, see the manual Backup and Recovery,
v _ Verified the availability of a compatible alternate IPL device (tape unit attached to the system bus 1). If the system uses an alternate installation device for install or restore operations, ensure the availability of the location information for that device.
Data migration
__ 1. Using the Backup and Recovery book, Chapter 4, checklist 20 steps 1 through 9, perform a recovery after a complete system loss. Include the following additions before the IPL. The Backup and Recovery manual,
__ 2. Rename or replace the hardware descriptions on the target system.
a.On the command line, type WRKHDWPRD and press the Enter key.
b.Select the Change description label locations option. Press the Enter key.
c.If a controller or device no longer has a valid resource on the system, the
Using Change Description Label Locations display appears, allowing you to make corrections.
d.Determine whether the new target system has different communications lines or storage than the source system. If so, check the work management objects. For more information, see the Work management topic under Systems Management in the Information Center.
__ 3. Install any new LPPs or PTFs. For more information, refer to the Software Installation book.
__ 4. Change the QAUTOCFG, QIPLTYPE, and QPFRADJ system values to the desired values. For more details, refer to the book Basic System Operation, Administration, and Problem Handling ,
Verify that all objects were restored from the source system. Use the Backup and Recovery book to fix any discrepancies.
__ 5. Perform an IPL.
__ 6. Print a copy of your system configuration information:
v _ Generate reports of the hardware and configuration objects by issuing the following command:
PRTSYSINF
v_ Print the spooled file that was generated by the above command.
v_ Print a new system configuration list using Start a service tool option. To do this complete the following steps on the AS/400 Main menu command line:
a.Start System Service Tools by entering:
STRSST
b.On the STRSST display, select Start a service tool option. Press the Enter key.
c.On the Start a Service Tool display, select Hardware service manager. Press the Enter key.
d.From the Hardware Service Manager display, press F6 (print configuration).
e.Your system configuration should print. Keep the list for future reference.
32 iSeries 940x
f.Return to the AS/400 Main menu, Press F3 (Exit) twice, and then press the Enter key.
__ 7. Save the entire system. Use Option 21 on the Save menu. For more information about saving the entire system using option 21, refer to any of the following:
vThe chapter on saving your iSeries server in the manual Backup and Recovery,
vThe Backup, recovery, and availability topic under Systems Management in the Information Center:
http://www.ibm.com/eserver/iseries/infocenter
To find the procedure for saving the entire system (using option 21) in the Information Center, do the following:
a.Click Systems Management
b.Click Backup, recovery, and availability
c.Click Backing up your server
d.Click Saving your server with the GO SAVE command
e.Click Saving your whole server with GO SAVE: Option 21
__ 8. Resume normal operations and verify that all your applications run properly.
__ 9. IBM recommends that you tune the system performance. There are billable services available that can do this for you. You can find information about performance tuning in the Work Management manual. A PDF version of this manual is available from the iSeries Information Center under Systems Management
Chapter 4. Procedure for a Data Migration
34 iSeries 940x
Appendix A. AS/400 Global Services
The following appendix describes
iSeries and AS/400 Data Migration Services
IBM has a
Selected hardware service representatives have been trained to deliver this service. Only an AS/400 Data Migration Services trained hardware service representative should attempt this procedure. This representative can assess the appropriateness of this activity.
If you would like more information about AS/400 Data Migration Services, contact your IBM iSeries 400 and AS/400 hardware service representative. Your IBM iSeries 400 and AS/400 hardware service representative can perform the procedure or put you in contact with the closest trained hardware service representative.
LPAR Planning and Implementation Services
It will assist a customer in planning and installing iSeries 400 and AS/400 logical partitioning on a new or existing
For more information, contact your local IBM representative or business partner or see the following Web site:
http://www.as400.ibm.com/lpar
iSeries Planning and Migration Services
It will assist a customer in planning and migrating to the iSeries 400 V4R5 or later server line. This service will provide a planning session with the customer to ensure that all known customer requirements are fully discussed with a final hardware and software configuration and installation plan provided. The services specialist can also perform
System Migration Services
IBM has a
release level or a different release level. Selected hardware service representatives have been trained to deliver this service. Only an AS/400 System Migration
Related Support Services
For related support services, see the AS/400 Technical Support Web site at
http://www.as400service.ibm.com.
Notes:
1.Contact your marketing representative for information about the services that are available in your area.
2.For information about IBM Global Services, see the following Web site: http://www.ibm.com/services
AS/400 Solution Services
See:
Installation Services
With Installation Services, IBM takes over the responsibility of planning and installing the iSeries 400 hardware and software. This service includes the following:
vIBM Smooth Start Services for iSeries 400.
vA project manager for installation
v
vSystem software loading and enabling
vInstallation of Customer Set Up (CSU) or
vComprehensive site planning
Performance Examinations
The IBM iSeries 400 and AS/400 Performance Examination (PERFEX) provides an
vHigh quality graphical and chart representation
vPerformance recommendations and conclusions
vA detailed, written summary
vPerformance education
Consulting Services
Consulting services provide customized consultation on any iSeries 400 topic that is important to the customer. This personalized assistance from IBM consultants is one of the most popular services at IBM. The topics include the following:
vCapacity planning
vPerformance analysis
36 iSeries 940x
vApplication planning to implementation
vApplication design review
vApplication design
vAS/400 Communications network consulting
vAS/400 unattended operations for communications applications
vSecurity audit
v
vClient Access/400
vAS/400 recovery readiness audit
vMultiple implementations
Midrange Enhanced Software Service (MRESS)
The purpose of MRESS is to increase the technical staff of the customers who want a direct link to an IBM Software Service Representative. The representative supports iSeries 400 and AS/400 system software, makes PTF recommendations, and notifies the customer about problems that might affect system operation. MRESS includes the following:
vSoftware problem resolution
vPTF consultation
v
Appendix A. AS/400 Global Services 37
38 iSeries 940x
Appendix B. Considerations and Solutions
See the AS/400 Homepage, AS/400 Information Center for further information regarding your concerns.
http://www.as400.ibm.com
http://www.as400.ibm.com/infocenter
http://www.ibm.com/eserver/iseries/infocenter
IBM HTTP Server for AS/400
When migrating your AS/400 system from V3R7 to V4R2, some existing common gateway interface, CGI programs may not function correctly. The CGI interface in V4R2 was changed to improve performance.
What was the change?
The AS/400 runtime environment now allows the IBM HTTP Server for AS/400 to put into effect byte streams for CGI standard in and standard out.
Why was the change made?
Customer requirements caused this change to remove the line length limitations on, (standard in and standard out).
What problems were detected or flagged?
1.Programs that call QtmhRdStdin multiple times to read the standard in data are incorrect, and this does not work.
2.All programs that read from (standard in), (QtmhRdSdtin) need to check the
Why was the change made?
Customer requirements to remove the 250 byte limit on standard in and standard out, motivated the change.
When was the change made?
The change is available via the following PTFs:
vV4R1 - 5769SS1 SF46810
v5769TC1 SF47332
vV4R2 - 5769TC1 SF46558
What should the customer do?
The customer should use the Web Programming Guide to ensure that the programs meet standard guidelines.
Operations Console
For information about setting up and configuring Operations Console, see the manual Operations Console Setup,
OptiConnect
For information pertaining to an upgrade, see the book OptiConnect for OS/400,
Integrated Netfinity Server
See the book Getting Started with Integrated Netfinity Server,
Clustering and Logical Partitions
IBM representatives can get further information about clustering and logical partitions from the iSeries Information Center
http://www.ibm.com/eserver/iseries/infocenter
Follow the link to Planning and then Logical Partitions.
Lotus Notes Enhanced Integration
For V4R4M0, OS/400 option 24 (OS/400 Lotus Notes Enhanced Integration) is no longer supported, and is deleted when upgrading to V4R4M0. A migration of the data in (OS/400 Lotus Notes Enhanced Integration) must be accomplished before the upgrade. IBM recommends migrating the data to Lotus Domino. For detailed migration instructions see the following URL:
http://www.as400.ibm.com/techstudio
OnDemand
Consideration when upgrading to
vIf your target release is Version 4 Release 2 (or a later release) and your source system has either of the following features installed:
???
???
And you plan to use either of the following features on your target system:
???
???
Then:
???For OnDemand migration and upgrade information, see the book LPS: OnDemand for AS/400,
SRC A900 2000 Recovery
Attention: Use this procedure only if no workstation on your system is operational:
40 iSeries 940x
1.Find your copy of the Basic System Operation, Administration, and Problem Handling book. It describes the procedures for working with the control panel on your processor unit. Use it for more information on how to perform the remaining tasks.
2.Use the system control panel to place your system in manual mode.
3.Use the system control panel to force power down on your system.
4.Perform an IPL on your system.
5.Sign on as QSECOFR.
6.On the IPL or Install the System display, select option 1 (perform an IPL).
7.On the IPL Options display, specify Y for the Define or change the system at IPL prompt.
8.On the Define or Change the System at IPL display, select 3 (System value commands).
9.On the System Value Commands display, select 3 (Work with System Values).
10.On the Work with System Values display, type QIPLTYPE in the Position to field.
11.In the Option column for the QIPLTYPE system value, type 2 (Change).
12.On the Change System Value display for the QIPLTYPE system value, type 2 (Attended IPL, console in debug mode).
13.Press the Enter key. You see the Work with System Values display.
14.Press F3 twice to return to the Define or Change Your System display.
15.Press F3 (Exit and continue IPL) to continue your IPL.
How to Move Files That Have Been Saved with Storage Free Specified
If you have saved database files and specified STG(*FREE), you must take special steps to transfer the descriptive information about those files to your RISC target system. (All customers must do this, whether or not you have the Media and Storage Extensions product installed.) When you save a database file and specify STG(*FREE), the system saves the contents of the file. The system then deletes the contents from the system copy of the file, so that the contents exist only on the save media. The file description information, including a list of members, remains on the system as a type of archival record. To create usable object descriptions for your RISC target system, use the procedures that follow. If your source system does not have adequate auxiliary storage to restore the contents of archival files, you might need to make arrangements to use another system to restore your files and save them again. Make sure that the system has a tape unit that is compatible with the tape unit that you will have on your upgraded system.
How to Move Freed Database Files without New Members
Use the procedure below only if both of the following conditions are true:
1.The database file on the source system was previously saved with STG(*FREE).
2.No new members were added to the file after it was saved on the source system.
If both conditions were true, move freed database files without new members as follows:
1.For a physical file, use the
RSTOBJ command or the
Appendix B. Considerations and Solutions 41
RSTLIB
command to restore the file. For a logical file, use the
RSTOBJ
command or the
RSTLIB
command to restore the
2.If you need to save the files separately to make space available on your system, use the
SAVOBJ or SAVLIB
command. Do not specify STG(*FREE). Make sure that you mark the save tapes. You can then delete the files or save them again on different tapes with STG(*FREE).
3.After you have restored the files to your target system, you can save them again with STG(*FREE). The object description remains on your upgraded system as an archival record.
If you have a file that has some members with contents and other members that were saved with STG(*FREE), you must create a version of the file that has a complete set of members with contents. You do this by restoring the members that were saved with STG(*FREE). When the complete database file is on the system, perform again the specific instructions for saving your system. These instructions are outlined in the upgrade or migration procedure that sent you here.
42 iSeries 940x
Appendix C. Obtain the Latest Preventive Service Planning
Information
You need the most recent cumulative package of the Preventive Service Planning Information. The IBM software support center updates this information regularly. It provides the most current information about conditions that could impede your software installation process.
There are multiple preventive service planning documents, categorized by topic. We recommend that you review at least the software installation document and the general document for the release of the operating system. The general document lists topics covered in additional preventive service planning information documents that you might want to order, if they apply to your system.
You can order the preventive service planning documents through electronic customer support:
For all customers, PTFs can be downloaded from the following Web site:
http://as400service.ibm.com
You need to register at this site. To download a PTF, go to the AS/400 Internet PTF Facility:
1.Click Fixes, Downloads and Updates.
2.Click Internet PTF Downloads (iPTF).
If you do not have access to electronic customer support, contact your software support provider to obtain this information. This ensures that you will receive the required PTF as well. Information about displaying and printing preventive service planning documents is available in the Ordering fixes topic under System planning and installation
44 iSeries 940x
Appendix D. Notices
This information was developed for products and services offered in the U.S.A. IBM may not offer the products, services, or features discussed in this document in other countries. Consult your local IBM representative for information on the products and services currently available in your area. Any reference to an IBM product, program, or service is not intended to state or imply that only that IBM product, program, or service may be used. Any functionally equivalent product, program, or service that does not infringe any IBM intellectual property right may be used instead. However, it is the user???s responsibility to evaluate and verify the operation of any
IBM may have patents or pending patent applications covering subject matter described in this document. The furnishing of this document does not give you any license to these patents. You can send license inquiries, in writing, to:
IBM Director of Licensing
IBM Corporation
500 Columbus Avenue
Thornwood, NY 10594
U.S.A.
For license inquiries regarding
IBM World Trade Asia Corporation
Licensing
Tokyo 106, Japan
The following paragraph does not apply to the United Kingdom or any other country where such provisions are inconsistent with local law:
INTERNATIONAL BUSINESS MACHINES CORPORATION PROVIDES THIS
PUBLICATION ???AS IS??? WITHOUT WARRANTY OF ANY KIND, EITHER
EXPRESS OR IMPLIED, INCLUDING, BUT NOT LIMITED TO, THE IMPLIED
WARRANTIES OF
This information could include technical inaccuracies or typographical errors. Changes are periodically made to the information herein; these changes will be incorporated in new editions of the publication. IBM may make improvements and/or changes in the product(s) and/or the program(s) described in this publication at any time without notice.
Licensees of this program who wish to have information about it for the purpose of enabling: (i) the exchange of information between independently created programs and other programs (including this one) and (ii) the mutual use of the information which has been exchanged, should contact:
IBM Corporation
Software Interoperability Coordinator
3605 Highway 52 N
Rochester, MN
U.S.A.
Such information may be available, subject to appropriate terms and conditions, including in some cases, payment of a fee.
The licensed program described in this information and all licensed material available for it are provided by IBM under terms of the IBM Customer Agreement or any equivalent agreement between us.
Any performance data contained herein was determined in a controlled environment. Therefore, the results obtained in other operating environments may vary significantly. Some measurements may have been made on
Information concerning
All statements regarding IBM???s future direction or intent are subject to change or withdrawal without notice, and represent goals and objectives only.
The information herein is subject to change before the products described become available.
This information contains examples of data and reports used in daily business operations. To illustrate them as completely as possible, the examples include the names of individuals, companies, brands, and products. All of these names are fictitious and any similarity to the names and addresses used by an actual business enterprise is entirely coincidental.
If you are viewing this information softcopy, the photographs and color illustrations might not appear in your view.
Trademarks
The following terms are trademarks of International Business Machines
Corporation in the United States, or other countries, or both:
Advanced 36
Advanced
Application System/400
APPN
AS/400
AS/400e
Client Access/400
IBM
Integrated Netfinity Server
Operating System/400
OS/400
46 iSeries 940x
PowerPC AS
RETAIN System/36 400
Lotus is a trademark of Lotus Development Corporation in the United States, or other countries, or both.
Microsoft, Windows, Windows NT, the Windows 95 and the Windows 98 logo are registered trademarks of Microsoft Corporation.
Java and HotJava are trademarks of Sun Microsystems, Inc.
UNIX is a registered trademark in the United States and other countries licensed exclusively through X/Open Company Limited.
PC Direct is a registered trademark of Ziff Communications Company and is used by IBM Corporation under license.
Other company, product, and service names may be trademarks or service marks of others.
Appendix D. Notices 47
48 iSeries 940x
Index
A
C
command, CL
D
Display Hardware Resources (DSPHDWRSC) command 22, 29
DSPHDWRSC (Display Hardware Resources) command 22, 29
F
Files Saved with Storage Free Specified 41
from models 4xx, 5xx, Sxx or 6xx to a 7xx 12
from models 6xx or 7xx to a 8xx 14
H
hardware service representative tasks 24
?? Copyright IBM Corp. 1997, 2001
how long will the data migration take 5 how long will the upgrade take 3
How to Move Files That Have Been Saved with Storage Free Specified 41
I
information
ordering additional
preventive service planning 43 Installation Services 36
installing
from an alternate installation device considerations for placing an
order 11 installing the hardware 24
Interactive Specify codes, Sxx 13 iSeries Planning and Migration
L
LPAR Planning and Implementation
M
MES upgrade 1 message
Midrange Enhanced Software Service 37 MRESS 37
N
O
ordering assistance 15 ordering prerequisites
hardware considerations 9 software items 9
system configurations considerations 9
ordering responsibilities 14 ordering specifications 11 ordering tasks
P
Performance Examinations 36 performing the upgrade
planning your order 7 PowerPC 2, 3
preventive service planning information ordering 43
R
recovery
SRC A900 2000 25 related support services 36 Retrieve Configuration Source
(RTVCFGSRC) command 22 return material equipment report
S
sending the order to other than IBM 15
U
upgrades covered in this road map
upgrading
W
what is a data migration 3 what is an upgrade 2 why upgrade 2
49
50 iSeries 940x
Readers??? Comments ??? We???d Like to Hear from You
iSeries
iSeries 940x
Publication No.
Overall, how satisfied are you with the information in this book?
How satisfied are you that the information in this book is:
Please tell us how we can improve this book:
Thank you for your responses. May we contact you? h Yes h No
When you send comments to IBM, you grant IBM a nonexclusive right to use or distribute your comments in any way it believes appropriate without incurring any obligation to you.
Company or Organization
Phone No.
Cut or Fold Along Line
Cut or Fold Along Line
????????????
Printed in the United States of America on recycled paper containing 10% recovered