Installation/Operating Instructions
220V Signature/Series E & V Electric Projection Screen
These Installation/Operating Instructions are available in the of???cial language of the country where you purchase the product. Please contact your distributor to request a copy.
Vous pourriez demander les instructions d???installation et d???op??ration traduises dans la langue of???cielle du pays ou vous achetez le produit. Veuillez demander ?? votre distributeur.
Die Gebrauchsanweisung f??r Installation und Konstruktion sind in der of???ziellen Sprache des Landes, indem Sie das Produkt gekauft haben, vorhanden. Fragen Sie die jeweilige
Wire connecting screen to switch(es) and switch(es) to power supply should be furnished by installer. Connections should be made in accordance with attached wiring diagram, and wiring should comply with National and local electrical codes. All operating switches should be ???OFF??? before power is connected.
Operation
Caution
??? Read instructions through completely before proceeding.
??? Follow instructions carefully. Installation contrary to instructions invalidates warranty.
???Entire bottom of screen case should be unobstructed to permit proper operation of automatic trap door, and access to bottom panel for
making electrical connections or servicing.
??? Screen should be installed level (using a carpenter???s level).
??? Nothing should be fastened to screen dowel, viewing surface or automatic trap door.
???Operating switch(es) is packed separately in screen carton. Do not discard with packing material.
??? Screen operates on 220V, 50 Hz. current.
NOTE: Screen has been thoroughly inspected and tested at factory and found to be operating properly prior to shipment.
These instructions are meant as a guide only. They do not imply any responsibility on the part of Draper, Inc. for improper installation or faulty workmanship at the jobsite.
Hanging Screen
When locating viewing surface and checking clearance for screen???s operation, remember that the surface is centered in case. Screen is normally recessed above ceiling and may be installed in a variety of ways. See details on back of this sheet. Regardless of mounting method used, the following points apply:
???Screen should be positively and securely supported so that vibration or even abusive pulling on viewing surface will not weaken installation.
???Installer must insure that fasteners used are of adequate strength and suitable for the mounting surface chosen.
??? Entire bottom of case must be readily accessible after installation.
???The hinge that connects bottom panel and automatic trap door of screen must be permitted to operate freely. Front and back of case must be
paint buildup, and doors must be unobstructed by ceiling tiles. ??? Do not use screen case to support adjacent sections of ceiling.
??? If trim pieces must be attached to case, do not permit screws to protrude more than 6.35 mm through 3.2 mm wall of case. Do not attach trim pieces with nails.
??? If case is painted, slots on bottom of case should be shielded to protect viewing surface from paint splatters or overspray.
???Do not seal unit in ceiling until electrical connections have been made and screen has been operated successfully.
Electrical Connections
Screen operates on 220V., 50 Hz., 1 ph. current. Junction box is located just above the access plate at left end of screen. Access plate is held closed with ??? athead screws and may be opened with a Phillips screwdriver. (Automatic trap door does not need to be opened to make ???eld connections.) Removal of access plate exposes terminal strip, per wiring diagram on reverse. Screen is shipped with internal wiring complete and control switch(es) fully boxed.
viewing surface DOWN to access screws that hold brackets to dowel. Loosen hex head screw, remove bracket and retighten screw at each end of dowel. Signature/Series
220V Single Station
220V Multiple Station Control (Not CE
24V
Key Operated Switching (Not CE
Adjustments
Screen has been factory set and should not require further adjustment. How- ever, if you wish to change the ???up??? and ???down??? stopping positions, proceed as follows:
CAUTION: Be sure all switches are in ???off??? position before adjusting limit switches. Always be prepared to shut screen off manually when new ad- justment is being tested. Screen may be severely damaged if viewing surface is allowed to run too far up or too far down.
Adjusting ???Fully Up???
Adjusting ???Fully Down???
Please note: See page 2 for information on adjusting
Case Dimensions and Methods of Installation
38 mm Typ
NOTE: Viewing surface shown is Series V with tab tensioning. Series E, without tab tensioning, is also available.
Small Signature Case
Shown with 9.5 mm 152
threaded rod mm (provided
by others).
Draper???s
Tensioning
??? Determine which side requires adjustment.Cable
??? Secure dowel with one hand.
???If problem is not corrected, leave screen in position
for 24 hours to allow surface material to stretch into position.
??? If problem still is not corrected, repeat steps 2 and 3.
Audience
Wiring Diagrams
Large Signature Case
Shown with
11 mm 152 threaded mm
rod (provided by others).
Ceiling grid and tile (by others)
Audience
Ceiling grid and tile (by others)
Single Station Control
CE Approved
Terminal strip in junction box at left end of screen
Control switch
Dashed wiring by electrician
230V, PE
50 Hz.
Multiple Station Control
Not CE Approved
Terminal strip in junction box at left end of screen
Cap off with wire nut & tape
Red Blue
by electrician
230V, 50 Hz.
Low Voltage & Wireless Control
MC1
See separate Serial
Dashed wiring by electrician Low voltage wiring by others
Eye Port for IR Eye, RF Receiver or LED Switch For more than one of these, a splitter is required.
Terminal strip in junction box at left end of screen
Neutral
Hot
Program LED
Fuse
MC1
Low Voltage Wiring by others
AC Wiring by electrician
RS232 Data FROM Control System
RS232 Data TO Control System
Signal Ground & Manual Switch Common
Manual Switch Down
Manual Switch Up
Eye Port for IR Eye. For RF Receiver or LED Wall Switch, a Splitter and a Power Supply is required. Plug RF Receiver or LED Wall Switch and Power Supply into splitter, then run cable from Splitter to MC1 Eye Port.
Terminal strip in junction box at left end of screen
Neutral
Hot
230V, 50 Hz.
Control
Switches
24v DC
3 Button Wall Switch
DOWN - Black
COM - White
UP - Red
Aux Port for connecting additional
230V, 50 Hz.
Control
Switches
24v DC
www.draperinc.com (765)