C H A P T E R 2
Preparing for Installation
This chapter describes the safety instructions and site requirements needed for installing the IE2100 Series device and guides you through installation preparation. It contains information about:
???Safety
???Preparing Your Site for Installation
???Required Tools and Equipment
Safety
This section provides safety information for installing this product.
Warnings and Cautions
Note Read the installation instructions in ???Installing and Configuring the IE2100 Series??? before you connect the system to its power source because you must be extremely careful when installing electrical devices. Failure to read and follow these guidelines could lead to an unsuccessful installation and possible damage to the system and components.
You should observe the following safety guidelines when working with any equipment that connects to electrical power or telephone wiring. They can help you avoid injuring yourself and damaging the IE2100 Series.
The following warnings and cautions are provided to help you prevent damage to the devices or injury to yourself:
Warning The safety cover is an integral part of the product. Do not operate the unit without the safety cover installed. Operating the unit without the cover in place will invalidate the safety approvals and pose a risk of fire and electrical hazards.
Cisco Intelligence Engine 2100 Series Configuration Registrar Manual
Chapter 2 Preparing for Installation
Safety
Warning Never defeat the ground conductor or operate the equipment in the absence of a suitably installed ground conductor. Contact the appropriate electrical inspection authority or an electrician if you are uncertain that suitable grounding is available.
Warning Before working on a chassis or working near power supplies, unplug the power cord on AC units; disconnect the power at the circuit breaker on DC units.
Warning Only trained and qualified personnel should be allowed to install, replace, or service this equipment.
Warning This product relies on the building???s installation for
Warning This equipment is intended to be grounded. Ensure that the host is connected to earth ground during normal use.
Warning Do not work on the system or connect or disconnect cables during periods of lightning activity.
Warning Before working on equipment that is connected to power lines, remove jewelry (including rings, necklaces, and watches). Metal objects will heat up when connected to power and ground and can cause serious burns or weld the metal object to the terminals.
Warning Ultimate disposal of this product should be handled according to all national laws and regulations.
Warning Before working on a system that has an On/Off switch, turn OFF the power and unplug the power cord.
Warning Read the installation instructions before you connect the system to its power source.
Warning The device is designed to work with TN power systems.
Cisco Intelligence Engine 2100 Series Configuration Registrar Manual
Chapter 2 Preparing for Installation
Safety
Warning The ports labeled ???10BaseT???, ???100BaseTX???, and ???10/100??? are safety
Warning There is the danger of explosion if the battery is replaced incorrectly. Replace the battery only with the same or equivalent type recommended by the manufacturer. Dispose of used batteries according to the manufacturer???s instructions.
Working with Electricity
Follow these guidelines when working on electrical equipment:
???Locate the emergency
???Disconnect all power by powering off the system and unplugging the power cord before:
???Installing or removing a chassis
???Working near power supplies
???Do not work alone if potentially hazardous conditions exist.
???Never assume that power is disconnected from a circuit; always check the circuit.
???Look carefully for possible hazards in your work area, such as moist floors, underground power extension cables, frayed power cords, and missing safety grounds
???If an electrical accident occurs:
???Use caution: do not become a victim yourself.
???Power off the system.
???If possible, send another person to get medical aid. Otherwise, assess the victim???s condition, then call for help.
???Determine if the person needs rescue breathing or external cardiac compressions; then take appropriate action.
???Disconnect all power and external cables before installing or removing a chassis.
???Never install equipment that appears damaged.
???Never install telephone wiring during a lightning storm.
???Never install telephone jacks in wet locations unless the jack is specifically designed for wet locations.
???Never touch uninsulated telephone wires or terminals unless the telephone line has been disconnected at the network interface.
???Always use caution when installing or modifying telephone lines.
???Never perform any action that creates a potential hazard to people or makes the equipment unsafe.
Cisco Intelligence Engine 2100 Series Configuration Registrar Manual
Chapter 2 Preparing for Installation
Preparing Your Site for Installation
Preventing Damage from Electrostatic Discharge
Electrostatic discharge (ESD) can damage equipment and impair electrical circuitry. ESD damage occurs when electronic components are handled improperly and can result in complete or intermittent failures.
???Always follow
???Periodically check the resistance value of the antistatic strap, which should be between 1 and 10 Mohms.
Preventing EMI
When you run wires for any significant distance in an electromagnetic field, electromagnetic interference (EMI) can occur between the field and the signals on the wires.
Note that:
???Bad plant wiring can result in radio frequency interference (RFI).
???Strong EMI, especially when it is caused by lightning or radio transmitters, can destroy the signal drivers and receivers in the system, and can even create an electrical hazard by conducting power surges through lines and into the system.
To predict and remedy strong EMI, consult RFI experts.
Covering Empty Slots
Ensure that all cards, faceplates, and covers are in place. Blank faceplates and cover panels are used to:
???Prevent exposure to voltages and currents inside the chassis.
???Help contain electromagnetic interference (EMI) that might disrupt other equipment.
???Direct the flow of cooling air through the chassis.
Preparing Your Site for Installation
Make sure your site is prepared properly before beginning installation.
Environmental
When planning your site layout and equipment locations, keep in mind the precautions described in this section to help avoid equipment failures and reduce the possibility of environmentally caused shutdowns. If you are currently experiencing shutdowns or unusually high errors with your existing equipment, these precautions will help you isolate the cause of failures and prevent future problems.
Use the following precautions when planning the operating environment for your IE2100 Series.
Cisco Intelligence Engine 2100 Series Configuration Registrar Manual
Chapter 2 Preparing for Installation
Preparing Your Site for Installation
???Always follow the
???Make sure the chassis cover is secure. The chassis is designed to allow cooling air to flow effectively within it. An open chassis allows air leaks, which could interrupt and redirect the flow of cooling air from internal components.
???Electrical equipment generates hear. Ambient air temperature might not be adequate to cool equipment to acceptable operating temperatures without adequate circulation. Make sure that the room in which you operate has adequate air circulation.
Choosing a Site For Installation
Warning This unit is intended for installation in restricted access areas. A restricted access area is where access can only be gained by service personnel through the use of a special tool, lock and key, or other means of security, and is controlled by the authority responsible for the location.
???Choose a site with a dry, clean,
???Choose a site that maintains an ambient temperature of 32 to 104 degrees F (0 to 40 degrees C).
Grounding the System
Warning Never defeat the ground conductor or operate the equipment in the absence of a suitably installed ground conductor. Contact the appropriate electrical inspection authority or an electrician if you are uncertain that suitable grounding is available.
Creating a Safe Environment
Follow these guidelines to create a safe operating environment:
???Keep tools and chassis components off the floor and away from foot traffic.
???Clear the area of possible hazards, such as moist floors, ungrounded power extension cables, and missing safety grounds.
???Keep the area around the chassis free from dust and foreign conductive material (such as metal flakes from nearby construction activity).
Cisco Intelligence Engine 2100 Series Configuration Registrar Manual
Chapter 2 Preparing for Installation
Preparing Your Site for Installation
AC Power
???The system is designed for connection to TN power systems. A TN power system is a power distribution system with one point connected directly to earth (ground). The exposed conductive parts of the installation are connected to that point by protective earth conductors.
???Ensure that the
The IE2100 Series has the following power requirements:
???Universal input:
???Frequency:
???Maximum power: 65 watts
Warning This product relies on the building???s installation for
Warning The device is designed to work with TN power systems.
Cabling
Use the cables in the accessory kit to connect the IE2100 Series console port to a console or computer that is running a console program. In addition to the console cable, you must supply your own standard Ethernet cable to connect the IE2100 Series to your network. This section details the pinout information for these cables, so that you can purchase the correct cable for your network connection, and replace the console cable and adapters if that becomes necessary.
A structured wiring system provides a standardized way to wire a building for all types of networks for the IE2100 Series appliance to be installed. The main distribution frame links all the building???s interior wiring and provides an interface connection to circuits coming from outside sources such as the local telephone company. Wiring hubs (peripherals for cabling installations) provide the connection logic unique to Fast Ethernet cables that the IE2100 Series uses. Unshielded twisted pair (UTP) copper wire is used to connect the IE2100 Series and distributes the network connections to wall jacks near each piece of network equipment.
Warning The ports labeled ???10BaseT???, ???100BaseTX???, and ???10/100??? are safety
Ethernet Standards
To connect the IE2100 Series to your network, you must use one of the following Fast Ethernet cables:
???An
???An
Cisco Intelligence Engine 2100 Series Configuration Registrar Manual
Chapter 2 Preparing for Installation
Preparing Your Site for Installation
The Ethernet configuration using unshielded twisted pair (UTP) wire is known as 10BaseT because it uses 10 megabits per second (Mbps) signaling speed, direct current, or baseband, signaling, and twisted pair wire.This configuration includes a central wiring hub with special circuitry to isolate malfunctioning segments of the network. UTP wire uses an
Use a CAT 5 UTP cable at minimum to connect to a 100BaseT network. Use a CAT 3 UTP cable at minimum to connect to a 10BaseT network.
Table
Table
Table
Table
Cisco Intelligence Engine 2100 Series Configuration Registrar Manual
Chapter 2 Preparing for Installation
Preparing Your Site for Installation
Console Cable and Adapter
The
You can attach the two
The communication parameters are based on
Table
Table
Rollover Cable
You can identify a rollover cable by comparing the two modular ends of the cable (Figure
page
Cisco Intelligence Engine 2100 Series Configuration Registrar Manual
Chapter 2 Preparing for Installation
Figure
49339
A
Warning To prevent bodily injury when mounting or servicing this unit in a rack, you must take special precautions to ensure that the system remains stable. The following guidelines are provided to ensure your safety:
???This unit should be mounted at the bottom of the rack if it is the only unit in the rack.
???When mounting this unit in a partially filled rack, load the rack from the bottom to the top with the heaviest component at the bottom of the rack.
???If the rack is provided with stabilizing devices, install the stabilizers before mounting or servicing the unit in the rack.
Ensuring Proper Airflow
Follow these guidelines to ensure proper airflow:
???Install the system in an open rack whenever possible. If installation in an enclosed rack is unavoidable, ensure that the rack has adequate ventilation.
???Maintain ambient airflow to ensure normal operation. If the airflow is blocked or restricted, or if the intake air is too warm, an overtemperature condition can occur.
???Allow at least 6 inches (15.24 cm) of clearance around the ventilation openings of the chassis.
Cisco Intelligence Engine 2100 Series Configuration Registrar Manual
Chapter 2 Preparing for Installation
Required Tools and Equipment
???Avoid placing the system in an overly congested rack or directly next to another equipment rack. Heat exhaust from other equipment can enter the inlet air vents and cause an overtemperature condition.
???Equipment near the bottom of a rack might generate excessive heat that is drawn upward and into the intake ports of the equipment above. The warm air can cause an overtemperature condition in the equipment above.
???Ensure that cables from other equipment do not obstruct the airflow through the chassis or impair access to the power supplies or cards. Route cables away from
Stabilizing the System
Follow these guidelines to stabilize the equipment rack:
???Install any stabilizers that came with your equipment rack before mounting or servicing the system in the rack.
???Load the rack from the bottom to the top, with the heaviest system at the bottom.
???Do not stack the system on top of any other equipment. If the system falls, it can cause severe bodily injury and damage the equipment.
???If you are using an equipment shelf, ensure that the shelf is constructed to support the weight and dimensions of the chassis.
???If you are using a telco rack, ensure that the weight of the chassis does not make the rack unstable. Secure the telco rack with ceiling brackets if the rack is populated with heavy equipment.
???Bolt the rack to the floor for stability.
Lifting the System
Follow these guidelines when lifting the system:
???Disconnect all power and external cables before lifting the system.
???Ensure that your footing is solid and the weight of the system is evenly distributed between your feet.
???Lift the system slowly, keeping your back straight. Lift with your legs, not with your back. Bend at the knees, not at the waist.
Required Tools and Equipment
You need the following tools and equipment to install the system:
???The provided accessory kit, which includes:
???
???Console cable
???Power cord
???Antistatic mat or antistatic foam
???ESD grounding strap
Cisco Intelligence Engine 2100 Series Configuration Registrar Manual
Chapter 2 Preparing for Installation
Accessory Kit
???Ethernet cables
???If you are installing the chassis in a rack, you need:
???Number 2 Phillips screwdriver
???Tape measure and level
Accessory Kit
Table
Table
Cisco Intelligence Engine 2100 Series Configuration Registrar Manual
Chapter 2 Preparing for Installation
Accessory Kit
Cisco Intelligence Engine 2100 Series Configuration Registrar Manual